RERA Act 2016 in India: Complete Guide to Registration, Homebuyer Rights, Promoter Duties, Complaints, Penalties & Appeals

A section-by-section walkthrough of the Real Estate (Regulation and Development) Act, 2016 — written for homebuyers, promoters, real estate agents, law students and practising advocates.

Author: Advocate Bismay Dash Last updated: 14 August 2026 Reading time: ~24 min Category: Real Estate & RERA Law

This article is for general information only and is not case-specific legal advice. See the full disclaimer near the end of this page.

At a Glance

  • The Act (No. 16 of 2016) establishes a Real Estate Regulatory Authority in every State/UT to regulate and promote the sector.
  • It extends to the whole of India except the erstwhile State of Jammu and Kashmir.
  • Every real estate project above the Section 3 threshold must be registered before any advertising, marketing or booking.
  • Promoters must deposit 70% of amounts realised from allottees into a separate project bank account.
  • No more than 10% of the cost may be taken as advance before a registered Agreement for Sale.
  • Allottees get defined rights to information, possession, refund, interest and compensation.
  • Structural defects reported within 5 years of possession must be rectified within 30 days, free of charge.
  • Complaints go to the Authority or an Adjudicating Officer, depending on the nature of relief sought.
  • Appeals from the Authority/Adjudicating Officer lie to the Real Estate Appellate Tribunal within 60 days.
  • A further appeal lies to the jurisdictional High Court within 60 days on specified grounds.
  • The Act prescribes penalties for promoters, allottees and real estate agents, including imprisonment for repeated non-compliance.
  • Section 79 bars civil courts from matters the Authority, Adjudicating Officer or Tribunal is empowered to decide.
  • Section 89 gives the Act overriding effect over inconsistent laws.
Quick Answer

RERA (the Real Estate (Regulation and Development) Act, 2016) is a central law that requires most real estate projects and real estate agents to register with a State Real Estate Regulatory Authority, obliges promoters to disclose project details and use buyer money only on that project, gives allottees enforceable rights to information, possession, refund and compensation, and creates a dedicated Authority, Adjudicating Officer and Appellate Tribunal to resolve disputes — with appeal to the High Court as the final statutory step.

1. What is RERA and Why It Was Enacted

The Real Estate (Regulation and Development) Act, 2016 (Act No. 16 of 2016) is a Parliamentary statute enacted to establish a Real Estate Regulatory Authority in each State or Union Territory. Its stated purpose is the regulation and promotion of the real estate sector, ensuring that the sale of plots, apartments, buildings and real estate projects happens in an efficient and transparent manner, protecting consumer interest, and creating a dedicated adjudicating mechanism for speedy dispute resolution, with an Appellate Tribunal to hear appeals.

Before RERA, homebuyers dealt with promoters largely on the promoter's own contractual terms, with no statutory registry of projects, no mandated ring-fencing of buyer funds, and no dedicated forum offering time-bound relief. The Act addresses this by regulating promoters (developers/builders/landowners who sell units or plots), real estate agents (brokers/intermediaries), and by creating rights and obligations for allottees (buyers). It applies to the whole of India except the erstwhile State of Jammu and Kashmir, and different provisions were brought into force on different notified dates.

2. Important Definitions Under RERA

Section 2 of the Act defines the vocabulary the rest of the statute relies on. The most practically important terms:

Section 2(zk)

Promoter

Statutory conceptAnyone who constructs, converts, or develops land into a project for selling apartments, buildings or plots to others — including landowners' associates acting under power of attorney, development authorities, and co-operative housing societies building for their members.
Plain meaningThe developer/builder side of the transaction — whoever is legally responsible for delivering the flat, plot or building.
Practical significanceWhere the person who builds and the person who sells are different, both are jointly deemed promoters and jointly liable under the Act.
Section 2(d)

Allottee

Statutory conceptA person to whom a plot, apartment or building has been allotted, sold or transferred by the promoter, including a subsequent purchaser — but excludes someone who is merely given the unit on rent.
Practical significanceRights under Chapter IV attach to "allottees," not merely to the first buyer — a resale purchaser generally steps into those rights too.
Section 2(k)

Carpet Area

Statutory conceptThe net usable floor area of an apartment, excluding external walls and service shafts, but including internal partition walls; exclusive balcony/verandah and open terrace areas are separately identified.
Common misunderstandingCarpet area is not the same as "super built-up area" used in many older sale brochures — RERA disclosures are anchored to the statutory carpet area figure.
Section 2(n)

Common Areas

Statutory conceptIncludes the project land, staircases, lifts and lobbies, fire escapes, basements, terraces, parks, play areas, parking areas, storage spaces, staff accommodation, central service installations and all portions necessary for maintenance and common use.
Section 2(zn)

Real Estate Project

Statutory conceptDevelopment of a building, conversion of a building into apartments, or development of land into plots/apartments for sale, including common areas, development works and all appurtenant rights.

Other frequently used terms include agreement for sale (the contract between promoter and allottee), sanctioned plan (the site, building, service and layout plans approved by the competent authority), occupancy certificate and completion certificate (issued by the local competent authority under municipal/local laws), development works (split into internal and external development works), and real estate agent (any person who negotiates or facilitates a sale/purchase for remuneration, including brokers and property dealers).

3. Key RERA Numbers & Time Limits

10%
Max advance a promoter may take before a registered Agreement for Sale (Section 13)
70%
Of realised amounts must go into a separate project account (Section 4(2)(l)(D))
5 yrs
Structural-defect liability window after possession (Section 14(3))
30 days
Time for promoter to rectify a reported defect, free of charge (Section 14(3))
30 days
Registration/rejection decision window for the Authority (Section 5(1))
60 days
Period to appeal to the Appellate Tribunal (Section 44(2)) and to the High Court (Section 58)
60 days
Target disposal period for Authority applications (Section 29(4)) and appeals (Section 44(5))
30%
Minimum pre-deposit by a promoter before its Tribunal appeal is heard (Section 43(5) proviso)
2 months
Time for an allottee to take physical possession after the occupancy certificate (Section 19(10))
3 months
Deadline for ongoing projects to apply for registration from commencement of the Act (Section 3(1) proviso)
NoteRegistration is not required where the land proposed to be developed does not exceed 500 square metres, or the number of apartments (across all phases) does not exceed eight — subject to the appropriate Government's power to lower this threshold (Section 3(2)(a)).

4. RERA Project Registration

Under Section 3, no promoter may advertise, market, book, sell or invite offers for any plot, apartment or building in a real estate project without first registering that project with the Authority. Ongoing projects without a completion certificate as of the Act's commencement had three months to apply. Projects developed in phases must be registered phase-wise, each phase treated as a standalone project.

Registration is not required where the land is 500 sq. m. or less, or the project has eight or fewer apartments across all phases; where a completion certificate was obtained before the Act commenced; or for renovation/repair/re-development that does not involve new marketing or allotment.

Application (Section 4)

The promoter's application must include enterprise details, a five-year project track record, sanctioned plans and layout, development-works plan, project location with GPS boundaries, proforma allotment letter/agreement/conveyance deed, unit-wise carpet area and garage details, names of agents/contractors/architect/engineer, and a sworn affidavit covering legal title, encumbrances, the completion timeline, the 70% separate-account undertaking, pending-approval commitments, and other prescribed documents.

Grant, extension, revocation

The Authority must grant or reject registration within 30 days (Section 5), failing which the project is deemed registered. Registration is valid for the promoter's declared completion period and may be extended on account of force majeure (war, flood, drought, fire, cyclone, earthquake or similar) for up to one year in aggregate (Section 6). The Authority may revoke registration for default, violation of competent-authority approval terms, unfair practices, or fraud, after 30 days' notice and an opportunity to be heard (Section 7); on revocation, the project bank account is frozen and the association of allottees gets the first right of refusal to complete remaining works (Section 7–Section 8).

5. Functions and Duties of the Promoter (Chapter III)

Once registered, the promoter must publish and continuously update, on the Authority's website, the registration details, unit/garage booking status, pending approvals and quarterly project status (Section 11(1)). At booking, the promoter must make sanctioned plans, specifications and the stage-wise completion schedule available to the allottee (Section 11(3)).

The promoter remains responsible for all obligations until conveyance of every unit and the common areas, obtain the completion/occupancy certificate and share it with allottees, provide essential services until the association of allottees takes over maintenance, enable formation of an allottees' association (within three months of majority booking, absent local law), execute the registered conveyance deed, and continue paying outgoings collected from allottees until possession is transferred (Section 11). Structural-defect liability under Section 14(3) survives even after conveyance.

Also covered in Chapter IIITruthful advertising and compensation for loss caused by false statements (Section 12); the 10% advance cap before a registered agreement (Section 13); adherence to sanctioned plans, with minor changes needing allottee consent and structural changes needing two-thirds allottee consent (Section 14); restrictions on transferring the project to a third party without two-thirds allottee consent and Authority approval (Section 15); mandatory insurance of title and construction (Section 16); execution of the registered conveyance deed (Section 17); and return of amount with interest, or compensation, on default (Section 18).

6. The Agreement for Sale

Section 13 prohibits a promoter from accepting more than 10% of the cost as advance or application money without first entering into, and registering, a written Agreement for Sale. That agreement must specify the development particulars, construction and specification details, the payment schedule, the possession date, and the rate of interest payable by either party on default (Section 13(2)).

Agreement for Sale — Buyer Checklist

  • RERA registration number of the project is stated and verifiable on the Authority's website
  • Carpet area, exclusive balcony/terrace area and garage area are stated separately and match brochure claims
  • Sanctioned plan and specifications are annexed and match what was shown at booking
  • Possession date and payment milestones are clearly linked to construction stage
  • Interest rate on delay is mutual — same rate for promoter-to-allottee and allottee-to-promoter default (Section 2(za))
  • Terms for cancellation of allotment are stated and not unilateral or arbitrary
  • Common-area entitlements and maintenance handover terms are specified

7. Delay in Possession — Remedies Under Section 18

Where a promoter fails to complete or hand over possession by the agreed date, or discontinues business on suspension/revocation of registration, Section 18 gives the allottee a choice.

Possession delayed beyond the agreed date
Allottee wants to withdraw
Refund of amount paid, with prescribed interest, plus compensation (Section 18(1))
Allottee wants to continue
Monthly interest for every month of delay until possession is handed over (Section 18(1) proviso)

Separately, Section 18(2) entitles allottees to compensation for loss caused by a defective title of the project land, and this claim is expressly stated not to be barred by limitation. Section 18(3) covers compensation for any other failure by the promoter to discharge obligations under the Act, rules or the agreement.

Not stated in the ActThe Act does not itself fix a numerical interest rate for Sections 12, 18 or 19 — that rate is prescribed by the applicable State/UT Rules made under Section 84. Always check the specific State RERA Rules for the current prescribed rate.

8. Structural Defects and Defect Liability

Section 14(3) creates a five-year defect-liability window running from the date of handing over possession. If a structural defect, or any other defect in workmanship, quality or provision of services, or any other obligation under the Agreement for Sale, is brought to the promoter's notice within that period, the promoter must rectify it without charge, within 30 days. If the promoter fails to do so, the allottee is entitled to compensation as provided under the Act.

9. Rights and Duties of Allottees (Chapter IV, Section 19)

Rights of Allottees Information on sanctioned plans and specifications; the stage-wise completion schedule; possession of the unit (and, via the association, the common areas); refund with interest and compensation on promoter default; and handover of documents and plans after possession.
Duties of Allottees Make payments per the agreed schedule; pay their share of registration charges, municipal taxes, utility and maintenance charges; pay interest on delayed payments (at a rate that can be mutually reduced); participate in forming the allottees' association; take physical possession within two months of the occupancy certificate; and participate in registering the conveyance deed.

10. Real Estate Agents (Sections 9–10)

No real estate agent may facilitate sale or purchase of a unit in a registered project without obtaining registration from the Authority for the entire State/UT. Applications are decided within a prescribed period, failing which registration is deemed granted. Registered agents must not facilitate sales in unregistered projects, must maintain prescribed books and records, must avoid false or misleading representations, and must ensure buyers receive the information they are entitled to at the time of booking. Breach, misrepresentation or fraud can lead to suspension or revocation after a hearing.

11. The Real Estate Regulatory Authority (Chapter V)

Every appropriate Government must establish an Authority within one year of the Act coming into force (states may share a single Authority, or create more than one within a State). The Authority is a body corporate, headed by a Chairperson with at least two whole-time Members, appointed via a Selection Committee that includes the Chief Justice of the High Court or nominee. Its core functions (Section 34) include registering and regulating projects and agents, maintaining public databases (including a defaulters' list), fixing fees, and ensuring compliance with the Act, rules, regulations, and its own orders.

Its powers include calling for information and conducting civil-court-style investigations (Section 35), issuing interim orders to restrain ongoing or imminent contraventions (Section 36), issuing binding directions (Section 37), and imposing penalties or interest for contraventions by promoters, allottees or agents (Section 38). It can also refer competition-law issues to the Competition Commission of India, and may rectify apparent mistakes in its own orders within two years (Section 39), so long as no appeal against that order is pending.

12. How to File a RERA Complaint

  1. Identify the grievance — delay in possession, false advertisement, defective title, structural defect, non-registration, or a promoter/agent/allottee violation.
  2. Collect documents — the Agreement for Sale, allotment letter, payment receipts, correspondence, advertisements, and any notices exchanged.
  3. Identify the proper forum — the Authority generally, or the Adjudicating Officer where compensation under Sections 12, 14, 18 or 19 is being claimed (Section 71).
  4. Prepare the complaint in the prescribed form, stating facts and the relief sought (Section 31).
  5. File with the requisite fee, following the applicable State/UT procedure and (where available) online portal.
  6. Respond to notices issued by the Authority/Adjudicating Officer to the opposite party.
  7. Attend hearings — parties may appear in person or through an authorised representative (Section 56).
  8. Obtain the order — the Authority aims to dispose of applications within 60 days (Section 29(4)); the Adjudicating Officer similarly (Section 71(2)).
  9. Consider recovery/execution — unpaid interest, penalty or compensation is recoverable as arrears of land revenue (Section 40).
  10. Appeal if aggrieved — to the Appellate Tribunal within 60 days (Section 44), and thereafter to the High Court within 60 days (Section 58).
State variationExact complaint forms, fees, online filing systems and procedural timelines are governed by the concerned State/UT's RERA Rules and Regulations, not by the central Act itself.

13. Authority vs Adjudicating Officer

IssueRERA AuthorityAdjudicating Officer
Statutory basisChapter V, Section 20 onwardSection 71–Section 72
Core roleRegistration, regulation, general enforcement, penalties, directionsAdjudging compensation under Section Section 12, 14, 18 & 19
CompositionChairperson + Members appointed by appropriate GovernmentA judicial officer who is/was a District Judge
Complaint routeGeneral complaints under Section 31Compensation-specific claims under Section 71
Overlap with consumer foraNot applicablePending Consumer Protection Act cases may be withdrawn, with permission, and refiled here

14. Appeal Mechanism (Chapter VII)

RERA Authority / Adjudicating Officer order
↓ appeal within 60 days (Section 44), condonable for sufficient cause
Real Estate Appellate Tribunal
↓ appeal within 60 days (Section 58), condonable for sufficient cause
High Court (of the State/UT where the project is situated)

The Tribunal is not bound by the Code of Civil Procedure or the Evidence Act, but must follow natural justice, and has civil-court-style powers (summoning witnesses, discovery, reviewing its own decisions). Its orders are executable as a decree of a civil court (Section 57), and may be transmitted to a civil court of local jurisdiction for execution. A promoter's appeal will not even be entertained unless at least 30% of the penalty, or of the amount payable to the allottee (including interest and compensation), is first deposited with the Tribunal (Section 43(5) proviso) — the Tribunal may require a higher percentage. A further appeal lies to the jurisdictional High Court within 60 days, on grounds specified in Section 100 of the Code of Civil Procedure, 1908; no appeal lies against a Tribunal order made with the consent of parties (Section 58).

15. Offences, Penalties & Adjudication (Chapter VIII)

ProvisionPerson affectedNature of violationConsequence
Section 59PromoterSelling without registration (Section 3)Penalty up to 10% of estimated project cost; continued default — up to 3 years' imprisonment and/or a further 10% fine
Section 60PromoterFalse information / contravention of Section 4Penalty up to 5% of estimated project cost
Section 61PromoterAny other contravention of the Act/rulesPenalty up to 5% of estimated project cost
Section 62Real estate agentNon-registration / contravention of Section Section 9–10₹10,000 per day of default, up to 5% of unit cost
Section 63–64PromoterNon-compliance with Authority / Tribunal ordersDaily penalty up to 5% (Authority) or up to 3 years' imprisonment / 10% fine per day (Tribunal)
Section 65–66Real estate agentNon-compliance with Authority / Tribunal ordersDaily penalty up to 5% (Authority) or up to 1 year imprisonment / 10% fine per day (Tribunal)
Section 67–68AllotteeNon-compliance with Authority / Tribunal ordersDaily penalty up to 5% (Authority) or up to 1 year imprisonment / 10% fine per day (Tribunal)
Section 69CompaniesOffence committed by a companyPersons in charge of the business, and consenting/negligent officers, are also deemed guilty
Section 70Any convicted personCompounding of imprisonment offencesCourt may compound on terms, not exceeding the maximum fine prescribed

Percentage-based penalties are calculated on the "estimated cost of the real estate project" (land, taxes, cess, development and other charges — Section 2(v)) or on unit cost, as specified. Courts below a Metropolitan/Judicial Magistrate of the first class cannot try these offences, and cognizance requires a written complaint by the Authority or its authorised officer (Section 80).

16. RERA Explained Through Real-Life Scenarios

1

Builder delays possession by 18 months

ProvisionSection 18
ConsequenceBuyer may withdraw for refund + interest + compensation, or continue and claim monthly delay interest.
2

Promoter demands 25% before any Agreement for Sale

ProvisionSection 13
ConsequenceDemand beyond 10% before a registered agreement contravenes the Act; complaint can be filed and penalty under Section 61 may follow.
3

Project never registered with the Authority

ProvisionSection 3, Section 59
ConsequencePromoter faces penalty up to 10% of project cost, and possible imprisonment for continued default; buyer should verify registration before booking.
4

Sanctioned plan changed without consent

ProvisionSection 14
ConsequenceStructural changes require two-thirds allottee consent; unilateral change is a contravention giving rise to complaint and compensation.
5

Water seepage appears three years after possession

ProvisionSection 14(3)
ConsequenceFalls within the 5-year defect window; promoter must rectify free within 30 days of notice, or pay compensation.

17. Practical Checklists

RERA Homebuyer Due-Diligence Checklist

  • Project registration number verified on the State RERA website
  • Promoter's five-year track record and pending litigation reviewed
  • Land title and encumbrance position confirmed
  • Sanctioned plan, layout and approvals cross-checked with what is marketed
  • Carpet area, balcony/terrace area and garage area stated separately
  • Agreement for Sale reviewed before any payment beyond 10%
  • Payment schedule linked to construction milestones, not arbitrary dates
  • Project bank account / 70% utilisation disclosure checked where available

Promoter Compliance Checklist

  • Registration obtained before any advertising, marketing or booking
  • Web page on Authority's site kept current — bookings, approvals, project status
  • Separate 70% project account maintained and audited annually
  • Written, registered Agreement for Sale in place before accepting over 10% advance
  • Insurance obtained for title and construction
  • Allottees' association enabled within the prescribed period

18. Common Mistakes

By Homebuyers

  • Paying more than 10% before signing and registering the Agreement for Sale.
  • Not checking the project's RERA registration number before booking.
  • Ignoring the difference between carpet area and marketed "super area."

By Promoters

  • Advertising before registration is granted.
  • Mixing project funds across multiple projects instead of maintaining separate accounts.
  • Changing sanctioned plans without the required allottee consent.

By Real Estate Agents

  • Facilitating sales in unregistered projects.
  • Operating without a valid State registration number.

19. RERA Myths vs Facts

MythRERA only protects buyers, not promoters.
FactThe Act also protects promoters — for instance, allottees who default in payment or violate orders face penalties too (Section Section 67–68).
MythEvery project, however small, must register.
FactProjects at or below 500 sq. m. or 8 units are exempt under Section 3(2)(a), unless the appropriate Government lowers that threshold.
MythA buyer can walk into any civil court for a RERA dispute.
FactSection 79 bars civil courts from matters the Authority, Adjudicating Officer or Tribunal is empowered to decide.
MythThe Act fixes one uniform delay-interest rate nationally.
FactThe rate is prescribed by each State/UT's Rules under Section 84, not by the central Act itself.

20. RERA and Other Laws

Section 88 clarifies that RERA is in addition to, not in derogation of, other applicable laws — so instruments like the Transfer of Property Act, stamp and registration laws, the Companies Act, municipal building laws, and consumer protection law continue to apply alongside it. Section 89 separately gives RERA an overriding effect where its provisions are inconsistent with any other law. Whether a particular remedy should be pursued under RERA, consumer law, or ordinary civil/contract law in a given case depends on the facts and is a matter for judicial interpretation and professional advice.

21. Practical Legal Perspective for Advocates

Matters commonly turn on: whether the project or phase was validly registered at the relevant date; whether the 10%-advance and registered-agreement requirements under Section 13 were honoured; whether promised possession dates in the agreement (not merely brochures) support a Section 18 claim; and whether the claim properly belongs before the Authority or the Adjudicating Officer under Section 71. Documents to examine early include the registration certificate, the Agreement for Sale, payment receipts, sanctioned plans, and any Authority correspondence. On the promoter side, Section 43(5)'s pre-deposit condition should be planned for well before an appeal is filed, and Section 79's bar on civil-court jurisdiction should be checked before any parallel suit is contemplated.

22. Frequently Asked Questions

RERA is the Real Estate (Regulation and Development) Act, 2016, a central law establishing a Real Estate Regulatory Authority in each State/UT to regulate promoters, agents and protect allottees.

Broadly, anyone who builds or develops land for sale to others, including landowners acting through a power of attorney, development authorities, and co-operative housing societies building for members (Section 2(zk)).

The person to whom a unit/plot/building is allotted, sold or transferred, including subsequent purchasers — but not someone who merely rents it (Section 2(d)).

No. Projects at or below 500 sq. m. or 8 units (across phases) are exempt, along with projects that already had a completion certificate before the Act, and mere renovation/repair (Section 3(2)).

Promoters must deposit 70% of amounts realised from allottees into a separate scheduled-bank account, usable only for that project's construction and land cost, withdrawable in proportion to certified completion (Section 4(2)(l)(D)).

No. Section 13 caps advance/application money at 10% of the cost before a written, registered Agreement for Sale is executed.

Under Section 18, the allottee may withdraw for refund with interest and compensation, or continue and claim monthly interest for the delay period.

Five years from handing over possession; defects reported within that window must be rectified free within 30 days (Section 14(3)).

Only minor changes with individual consent; structural or layout alterations require the written consent of at least two-thirds of allottees (Section 14).

Before the State/UT Authority generally, or the Adjudicating Officer for compensation claims under Sections 12, 14, 18 and 19 (Section 31, Section 71).

60 days to appeal an Authority/Adjudicating Officer order to the Appellate Tribunal, and 60 days to appeal a Tribunal order to the High Court — both condonable for sufficient cause (Section 44, Section 58).

No. A promoter's appeal to the Tribunal will not be entertained without depositing at least 30% of the penalty or the amount payable to the allottee, or a higher percentage the Tribunal may fix (Section 43(5) proviso).

Yes. Section 56 permits appearance through legal practitioners, chartered accountants, company secretaries, cost accountants, or authorised officers.

Yes. Section 57 makes Tribunal orders executable as a civil court decree, and they may be transmitted to a local civil court for execution.

No. Section 79 bars civil courts from matters that the Authority, Adjudicating Officer or Tribunal are empowered to determine.

The net usable floor area excluding external walls and service shafts, including internal partition walls, with exclusive balcony/terrace areas stated separately (Section 2(k)).

Up to 10% of the estimated project cost, and for continued non-compliance, up to three years' imprisonment and/or a further 10% fine (Section 59).

Not entirely — Section 88 keeps other laws applicable alongside RERA, while Section 89 gives RERA overriding effect where there is inconsistency; which forum is correct depends on the facts.

Registration status, promoter track record, land title, sanctioned plans, carpet area figures, and the draft Agreement for Sale — before paying beyond 10%.

Yes — several operative details (interest rates, fees, forms, filing portals) are left to State/UT Rules made under Section 84, so the applicable State Rules must always be checked.

23. Key Takeaways

  • RERA regulates promoters and real estate agents and creates enforceable rights for allottees.
  • Registration is mandatory before marketing or selling, subject to the 500 sq. m./8-unit exemption.
  • No more than 10% advance may be taken before a registered Agreement for Sale.
  • 70% of realised funds must sit in a separate, audited project account.
  • Delay in possession gives a choice between refund-with-interest-and-compensation, or continuing with monthly delay interest.
  • Structural defects reported within five years must be fixed free within 30 days.
  • Complaints go to the Authority generally, or the Adjudicating Officer for compensation claims.
  • Appeals run Authority/AO → Appellate Tribunal (60 days) → High Court (60 days).
  • Promoter appeals require a minimum 30% pre-deposit.
  • Civil courts are barred from matters RERA forums are empowered to decide.
  • Penalties scale with the estimated project cost and escalate for continued non-compliance.
  • State/UT Rules fill in interest rates, fees and procedural detail — always check them.

Need Legal Assistance?

For project registration, Agreement for Sale review, possession-delay claims, or representation before the Authority, Adjudicating Officer or Appellate Tribunal, reach out to our team.

Consult Advocate Bismay Dash
BD

Advocate Bismay Dash

Advocate — Real Estate & RERA Law

Published: 14 August 2026  ·  Last reviewed: 14 August 2026

Legal Disclaimer This article is published for general educational and informational purposes on the Knowledge Centre of bismaydash.com and does not constitute legal advice for any specific case or transaction. Laws, rules, regulations and judicial interpretations may change after publication, and provisions may operate differently depending on State/UT-specific RERA Rules. Readers should seek professional legal advice tailored to their specific facts before acting on any information here.

Bismay Dash & Associates

Advocates & Legal Strategists, Saheed Nagar, Bhubaneswar, Odisha.

Practice Areas

Property Law  ·  Real Estate Law  ·  RERA Law  ·  Land Law  ·  Civil Litigation

© 2026 Bismay Dash & Associates. This page is for general information only and is not legal advice.